sábado, 26 de febrero de 2011
Sickness
Well This tetris game development sounds great and funny, but it is not like it for me. A stomach ache have not let me do much with my team. I hope I could be better soon to help my team.
lunes, 21 de febrero de 2011
Bad Design == Bad Implementation
This is frustrating because we did not finish the implementation, sincerely we never understood Team D design. We tried hard to change the design with them but they always followed their instincts. Worse to this, all my team started enthusiastic and at the integration part just Uriel and me(a little) worked on it. Dunno what happened, at the meetings everyone committed themselves to participate in each phase. As leader I don't feel guilty because I always motivated them to get involved in the project. I hope this won't prejudice me.
jueves, 17 de febrero de 2011
Having trouble with the implementation phase
Seems like the members of the team distributed different things to do like diagrams, description, UML and they are not consistent. We have talked to them and asking them too many things trying to understand their design and they have been accessible with us answering anything. I feel like we are lossing time in something that maybe is not as difficult as their design says. =S
viernes, 11 de febrero de 2011
Here we go again
So sorry if I did not give any life signals but the first partial exams takes all my time =(. We have finished the project 1 about unit tests and dunno what I feel =S. My team proposed me as leader this time and that makes me feel great =). We have started the design, we have everything, except the .doc or .pdf report for the first phase. We had a kind of data structure called Spin, which is like a linked list =0.
Suscribirse a:
Entradas (Atom)